TRUMPF Electronics: Inspection and testing (Part 3 von 8)

After the prototype is designed, the devices are subjected to various tests to verify their functionality, efficiency and cooling. To ensure the highest reliability in industrial plasma processes, the prototype must pass the accelerated aging test so that possible design weaknesses are eliminated already at the prototype stage. Further, the plasma generator will be tested under real operating conditions in an industrial-sized plasma system. https://www.trumpf.com/en_INT/products/powerelectronics/plasma-excitation/ -------------------------------------------------------------------- ► Follow us on social media: https://www.youtube.com/TRUMPFtube https://instagram.com/trumpf.group https://de.linkedin.com/company/trumpf-se-co-kg ► All about us and our solutions: https://www.trumpf.com ► Career at TRUMPF: https://www.trumpf.com/s/career ► Support us! ✔ Like ✔ Share ✔ Sub ► Imprint: www.trumpf.com/s/impressum

Filtern

Suchbegriff

Unterkategorie

Firmen

Inhaltstyp

Firmentyp

Land